6F2 Capping delivered in Wolverhampton
6F2 is a coarse recycled capping fill graded 0–125 mm, the most widely used capping material on UK earthworks. It builds a stable working platform over soft formations quickly and cheaply, and is the usual first import onto a site once the muckshift is under way.
Into Wolverhampton and across West Midlands we supply it loose by tipper, by grab lorry where a stockpile has to be loaded or reached over a boundary, or in bulk bags for plots a lorry can't discharge into. 24–72 hours on stocked lines across WV postcodes. 8-wheel tippers and grab lorries for tight urban plots, artic loads for larger industrial platforms, bulk bags where access is restricted.
Specification
- Grading
- 0–125 mm coarse graded
- Specification
- Clause 613 capping (Class 6F2)
- Material
- Recycled crushed concrete and hardcore
- Typical layer thickness
- Commonly 250–500 mm, per design
- Supply formats
- Loose tipper, artic bulk loads
- Typical load
- 16–20 t tipper, 28–29 t artic
Lead time
Sourced from regional recycling facilities — typically 2–4 working days depending on postcode and depth of stock, with test data supplied on request. On larger schemes we hold production against your programme so call-offs stay on date.
Typical uses on Wolverhampton sites
- General capping fill over weak subgrades
- Site haul roads, compounds and crane platforms
- Bulk level-up and fill on earthworks schemes
- Piling mat build-up where design permits
Former industrial land is the defining factor — made ground, contamination risk and remediation-led earthworks mean WAC testing and classification come first on many schemes. Recycled Type 1 and 6F5 capping are heavily used locally, often back-loaded on the same lorry that takes arisings away.
What shapes 6F2 Capping supply in Wolverhampton
Former industrial made ground with contamination risk is exactly why 6F2 Capping moves in volume around Wolverhampton — it builds a working platform that takes plant and lorry traffic before any sub-base goes down. Remediation-led earthworks plots with sequenced movements decide whether it arrives by tipper, grab or bulk bag. Where the same site is also producing made ground where WAC testing and classification come first on many schemes, we plan the removal and the delivery together so the lorry is not running one leg empty. The same routes serve Walsall, Dudley and Bilston.
Questions we get asked
Is 6F2 the same as crusher run or hardcore?
They overlap in practice but are not interchangeable on paper. 6F2 is a specified capping grading under Clause 613 with defined limits, whereas 'hardcore' is a generic term. If your spec names 6F2, order 6F2 and we'll supply the supporting data.
Can 6F2 be used as a sub-base?
No — 6F2 is a capping material. For sub-base use MOT Type 1 to Clause 803, or recycled Type 1 where secondary aggregate is permitted.
Which Black Country areas do you cover?
Wolverhampton, Walsall, Dudley, Bilston, Willenhall, West Bromwich and Cannock, plus Telford on the same routes.
Material out as well as in, around Wolverhampton
Most deliveries into Wolverhampton pair with a removal: the lorry takes your arisings to a licensed facility and comes back loaded, so you pay for one movement rather than two.
Need 6f2 capping in Wolverhampton?
Send us the tonnage, postcode and access — quote back within one working day.
