Brownfield remediation — Bilston
Made ground WAC-classified and removed, with recycled capping delivered to build the platform.
Grab lorries for muckaway, hardcore and site clearance across Wolverhampton and West Midlands. A grab loads itself from a stockpile, verge or trench spoil heap, so you don't need an excavator standing by — and the same lorry can return loaded with aggregate to keep movements down.
Former industrial land is the defining factor — made ground, contamination risk and remediation-led earthworks mean WAC testing and classification come first on many schemes. Recycled Type 1 and 6F5 capping are heavily used locally, often back-loaded on the same lorry that takes arisings away.
24–72 hours on stocked lines across WV postcodes. 8-wheel tippers and grab lorries for tight urban plots, artic loads for larger industrial platforms, bulk bags where access is restricted.
Around 12 tonnes — better for narrow residential streets and weight-restricted accesses.
Around 16 tonnes per load, the standard choice for construction and groundworks clearance.
Loads over a boundary, hedge or hoarding where the lorry can't get alongside the heap.
Lorry stays on site while your machine loads it, for jobs with limited stockpile space.
What's being loaded, where it sits and how far the arm needs to reach from the road.
6- or 8-wheel, standard or extended reach, sized to your access and weight limits.
Single load, day rate or phased across a programme, with transfer notes issued each time.
Grab haulage runs under registered waste-carrier licences with duty-of-care transfer notes per load, and drivers hold current CPC and site-safety accreditation.
Our credentialsMade ground WAC-classified and removed, with recycled capping delivered to build the platform.
Bedding stone and sharp sand grab-dropped through a narrow towpath-side access.
Recycled Type 1 delivered in phased tipper loads around live operations.
An 8-wheel grab carries roughly 16 tonnes per load and a 6-wheel around 12 tonnes. On tighter Wolverhampton streets the 6-wheel is often the only option that can get alongside the heap.
A standard arm works to around 6–8 metres from the lorry; extended-reach machines go further and can load over a wall, hedge or hoarding. Tell us the distance and we'll match the machine.
No — that's the main advantage of a grab. It loads itself, so you don't pay for a machine and operator to stand idle waiting for lorries.
Yes. Two-way loads are standard: the grab tips your arisings at a licensed facility and returns with Type 1, capping or bedding stone for the same site.
Tell us the material, volume and access — we come back within one working day.