Mixed-use scheme — Ancoats
Programmed call-off of MOT Type 1 and capping over a six-month groundworks package on a city-centre regeneration site.
Grab lorries for muckaway, hardcore and site clearance across Manchester and Greater Manchester. A grab loads itself from a stockpile, verge or trench spoil heap, so you don't need an excavator standing by — and the same lorry can return loaded with aggregate to keep movements down.
Manchester's mix of high-rise commercial, residential infill and major civic schemes means our local customers range from groundworkers on multi-plot sites to drainage contractors needing bedding stone at short notice. Muckaway and skip hire run alongside supply on most city-centre jobs.
Next-day tipper and grab availability across Greater Manchester on stocked lines. Bulk-bagged drops scheduled to suit confined city-centre sites, and two-way loads arranged where muck needs to come off before stone goes on.
Around 12 tonnes — better for narrow residential streets and weight-restricted accesses.
Around 16 tonnes per load, the standard choice for construction and groundworks clearance.
Loads over a boundary, hedge or hoarding where the lorry can't get alongside the heap.
Lorry stays on site while your machine loads it, for jobs with limited stockpile space.
What's being loaded, where it sits and how far the arm needs to reach from the road.
6- or 8-wheel, standard or extended reach, sized to your access and weight limits.
Single load, day rate or phased across a programme, with transfer notes issued each time.
Grab haulage runs under registered waste-carrier licences with duty-of-care transfer notes per load, and drivers hold current CPC and site-safety accreditation.
Our credentialsProgrammed call-off of MOT Type 1 and capping over a six-month groundworks package on a city-centre regeneration site.
100-plot residential development supplied with sub-base, building sand and pipe bedding on a weekly call-off schedule.
Made ground removed by grab from a town-centre site after WAC classification, with recycled Type 1 back-loaded on the return run.
An 8-wheel grab carries roughly 16 tonnes per load and a 6-wheel around 12 tonnes. On tighter Manchester streets the 6-wheel is often the only option that can get alongside the heap.
A standard arm works to around 6–8 metres from the lorry; extended-reach machines go further and can load over a wall, hedge or hoarding. Tell us the distance and we'll match the machine.
No — that's the main advantage of a grab. It loads itself, so you don't pay for a machine and operator to stand idle waiting for lorries.
Yes. Two-way loads are standard: the grab tips your arisings at a licensed facility and returns with Type 1, capping or bedding stone for the same site.
Tell us the material, volume and access — we come back within one working day.