Quayside works — Newcastle
Sub-base and bedding stone supplied for a riverfront route upgrade with night-time drop access and no on-site storage.
Grab lorries for muckaway, hardcore and site clearance across Newcastle and North East England. A grab loads itself from a stockpile, verge or trench spoil heap, so you don't need an excavator standing by — and the same lorry can return loaded with aggregate to keep movements down.
Civils and housing groundworks drive most of our North East volumes — Type 1 and 6F5 capping for platforms and haul roads, bedding stone for drainage runs, and grab muckaway for quayside and infill sites with limited storage space.
Tipper and grab loads available across Tyne and Wear within 24–72 hours. Northumberland and County Durham covered on standard lead times, with timed drops for quayside and restricted-access sites.
Around 12 tonnes — better for narrow residential streets and weight-restricted accesses.
Around 16 tonnes per load, the standard choice for construction and groundworks clearance.
Loads over a boundary, hedge or hoarding where the lorry can't get alongside the heap.
Lorry stays on site while your machine loads it, for jobs with limited stockpile space.
What's being loaded, where it sits and how far the arm needs to reach from the road.
6- or 8-wheel, standard or extended reach, sized to your access and weight limits.
Single load, day rate or phased across a programme, with transfer notes issued each time.
Grab haulage runs under registered waste-carrier licences with duty-of-care transfer notes per load, and drivers hold current CPC and site-safety accreditation.
Our credentialsSub-base and bedding stone supplied for a riverfront route upgrade with night-time drop access and no on-site storage.
Muckaway and recycled Type 1 coordinated across three drops for a city-centre square redevelopment.
70-plot rural development supplied with sub-base, bedding and topsoil on a call-off schedule.
An 8-wheel grab carries roughly 16 tonnes per load and a 6-wheel around 12 tonnes. On tighter Newcastle streets the 6-wheel is often the only option that can get alongside the heap.
A standard arm works to around 6–8 metres from the lorry; extended-reach machines go further and can load over a wall, hedge or hoarding. Tell us the distance and we'll match the machine.
No — that's the main advantage of a grab. It loads itself, so you don't pay for a machine and operator to stand idle waiting for lorries.
Yes. Two-way loads are standard: the grab tips your arisings at a licensed facility and returns with Type 1, capping or bedding stone for the same site.
Tell us the material, volume and access — we come back within one working day.