Civils package — Solihull
Phased Type 1 and 6F5 capping supply across a 14-month highways adoption scheme adjacent to a new logistics park.
Grab lorries for muckaway, hardcore and site clearance across Birmingham and West Midlands. A grab loads itself from a stockpile, verge or trench spoil heap, so you don't need an excavator standing by — and the same lorry can return loaded with aggregate to keep movements down.
Our Birmingham customer base is heavily weighted toward civils and highways — Type 1 sub-base, 6F5 capping and certified pipe bedding make up the bulk of weekly volumes — with muckaway and WAC testing on the excavation side of the same jobs.
Tipper and grab loads available across the West Midlands within 24–48 hours. Direct quarry haulage from the Midlands stone belt keeps loads efficient on bulk orders, and grab collections are timed around delivery slots for two-way running.
Around 12 tonnes — better for narrow residential streets and weight-restricted accesses.
Around 16 tonnes per load, the standard choice for construction and groundworks clearance.
Loads over a boundary, hedge or hoarding where the lorry can't get alongside the heap.
Lorry stays on site while your machine loads it, for jobs with limited stockpile space.
What's being loaded, where it sits and how far the arm needs to reach from the road.
6- or 8-wheel, standard or extended reach, sized to your access and weight limits.
Single load, day rate or phased across a programme, with transfer notes issued each time.
Grab haulage runs under registered waste-carrier licences with duty-of-care transfer notes per load, and drivers hold current CPC and site-safety accreditation.
Our credentialsPhased Type 1 and 6F5 capping supply across a 14-month highways adoption scheme adjacent to a new logistics park.
Pipe bedding delivered in timed windows for a service diversion on a constrained conversion site.
85-plot development supplied with sub-base and bedding, and muckaway coordinated with the groundworks contractor on a fortnightly call-off.
An 8-wheel grab carries roughly 16 tonnes per load and a 6-wheel around 12 tonnes. On tighter Birmingham streets the 6-wheel is often the only option that can get alongside the heap.
A standard arm works to around 6–8 metres from the lorry; extended-reach machines go further and can load over a wall, hedge or hoarding. Tell us the distance and we'll match the machine.
No — that's the main advantage of a grab. It loads itself, so you don't pay for a machine and operator to stand idle waiting for lorries.
Yes. Two-way loads are standard: the grab tips your arisings at a licensed facility and returns with Type 1, capping or bedding stone for the same site.
Tell us the material, volume and access — we come back within one working day.