Civils package — Solihull
Phased Type 1 and 6F5 capping supply across a 14-month highways adoption scheme adjacent to a new logistics park.
Soil sampling, UKAS WAC analysis and WM3 hazard assessment for sites across Birmingham and West Midlands. Classification tells you where your arisings can legally go before you commit to a disposal route — which on most Birmingham schemes is the difference between a straightforward muckaway and a stopped programme.
Our Birmingham customer base is heavily weighted toward civils and highways — Type 1 sub-base, 6F5 capping and certified pipe bedding make up the bulk of weekly volumes — with muckaway and WAC testing on the excavation side of the same jobs.
Tipper and grab loads available across the West Midlands within 24–48 hours. Direct quarry haulage from the Midlands stone belt keeps loads efficient on bulk orders, and grab collections are timed around delivery slots for two-way running.
Basic classification screen to confirm whether material is inert, non-hazardous or hazardous.
Complete leachate analysis for landfill acceptance where the facility requires it.
Our sampler attends, takes representative samples across the stockpile or dig and logs the locations.
Accelerated lab options from around 24 hours where the programme can't wait.
Representative samples taken to BS EN 14899 across the material to be moved.
UKAS lab runs the agreed suite, from screen through to full WAC leachate testing.
WM3 assessment issued, then we confirm the licensed facility that can accept the material.
Sampling follows BS EN 14899, leachate testing follows BS EN 12457-3 and analysis is carried out by UKAS-accredited laboratories, with WM3 assessment reports for your site file.
Our credentialsPhased Type 1 and 6F5 capping supply across a 14-month highways adoption scheme adjacent to a new logistics park.
Pipe bedding delivered in timed windows for a service diversion on a constrained conversion site.
85-plot development supplied with sub-base and bedding, and muckaway coordinated with the groundworks contractor on a fortnightly call-off.
A licensed facility can only accept material it's permitted to take. Testing classifies the arisings from your Birmingham dig so the right facility is booked first time, rather than a lorry being turned away and the programme slipping.
Standard turnaround is typically around five working days from sample receipt, with accelerated options from about 24 hours where the programme demands it.
Either. We can attend site and sample to BS EN 14899, or run the analysis on samples you've taken yourself if the sampling regime is sound.
Yes — that's the usual approach. We test first, confirm the route, then mobilise haulage to the licensed facility so there's no gap between classification and removal.
Tell us the material, volume and access — we come back within one working day.