Mixed-use scheme — Ancoats
Programmed call-off of MOT Type 1 and capping over a six-month groundworks package on a city-centre regeneration site.
Soil sampling, UKAS WAC analysis and WM3 hazard assessment for sites across Manchester and Greater Manchester. Classification tells you where your arisings can legally go before you commit to a disposal route — which on most Manchester schemes is the difference between a straightforward muckaway and a stopped programme.
Manchester's mix of high-rise commercial, residential infill and major civic schemes means our local customers range from groundworkers on multi-plot sites to drainage contractors needing bedding stone at short notice. Muckaway and skip hire run alongside supply on most city-centre jobs.
Next-day tipper and grab availability across Greater Manchester on stocked lines. Bulk-bagged drops scheduled to suit confined city-centre sites, and two-way loads arranged where muck needs to come off before stone goes on.
Basic classification screen to confirm whether material is inert, non-hazardous or hazardous.
Complete leachate analysis for landfill acceptance where the facility requires it.
Our sampler attends, takes representative samples across the stockpile or dig and logs the locations.
Accelerated lab options from around 24 hours where the programme can't wait.
Representative samples taken to BS EN 14899 across the material to be moved.
UKAS lab runs the agreed suite, from screen through to full WAC leachate testing.
WM3 assessment issued, then we confirm the licensed facility that can accept the material.
Sampling follows BS EN 14899, leachate testing follows BS EN 12457-3 and analysis is carried out by UKAS-accredited laboratories, with WM3 assessment reports for your site file.
Our credentialsProgrammed call-off of MOT Type 1 and capping over a six-month groundworks package on a city-centre regeneration site.
100-plot residential development supplied with sub-base, building sand and pipe bedding on a weekly call-off schedule.
Made ground removed by grab from a town-centre site after WAC classification, with recycled Type 1 back-loaded on the return run.
A licensed facility can only accept material it's permitted to take. Testing classifies the arisings from your Manchester dig so the right facility is booked first time, rather than a lorry being turned away and the programme slipping.
Standard turnaround is typically around five working days from sample receipt, with accelerated options from about 24 hours where the programme demands it.
Either. We can attend site and sample to BS EN 14899, or run the analysis on samples you've taken yourself if the sampling regime is sound.
Yes — that's the usual approach. We test first, confirm the route, then mobilise haulage to the licensed facility so there's no gap between classification and removal.
Tell us the material, volume and access — we come back within one working day.