Logistics park — Castle Donington
Phased Type 1 and 6F5 capping supply across a 12-month industrial groundworks scheme near East Midlands Airport.
Soil sampling, UKAS WAC analysis and WM3 hazard assessment for sites across Nottingham and East Midlands. Classification tells you where your arisings can legally go before you commit to a disposal route — which on most Nottingham schemes is the difference between a straightforward muckaway and a stopped programme.
Most Nottingham customers are civils and housing contractors working on city-fringe development and warehousing pads, where 6F5 capping, Type 1 sub-base and grab muckaway do the heavy lifting.
Tipper and grab loads available across Nottinghamshire and Derbyshire within 24–72 hours. The East Midlands Airport corridor is served on standard lead times, with timed windows for city-centre sites by arrangement.
Basic classification screen to confirm whether material is inert, non-hazardous or hazardous.
Complete leachate analysis for landfill acceptance where the facility requires it.
Our sampler attends, takes representative samples across the stockpile or dig and logs the locations.
Accelerated lab options from around 24 hours where the programme can't wait.
Representative samples taken to BS EN 14899 across the material to be moved.
UKAS lab runs the agreed suite, from screen through to full WAC leachate testing.
WM3 assessment issued, then we confirm the licensed facility that can accept the material.
Sampling follows BS EN 14899, leachate testing follows BS EN 12457-3 and analysis is carried out by UKAS-accredited laboratories, with WM3 assessment reports for your site file.
Our credentialsPhased Type 1 and 6F5 capping supply across a 12-month industrial groundworks scheme near East Midlands Airport.
Bedding stone and sub-base delivered in timed slots for a drainage and public-courtyard package beside a new residential tower.
90-plot residential development supplied with sub-base and bedding, plus muckaway, on a fortnightly call-off.
A licensed facility can only accept material it's permitted to take. Testing classifies the arisings from your Nottingham dig so the right facility is booked first time, rather than a lorry being turned away and the programme slipping.
Standard turnaround is typically around five working days from sample receipt, with accelerated options from about 24 hours where the programme demands it.
Either. We can attend site and sample to BS EN 14899, or run the analysis on samples you've taken yourself if the sampling regime is sound.
Yes — that's the usual approach. We test first, confirm the route, then mobilise haulage to the licensed facility so there's no gap between classification and removal.
Tell us the material, volume and access — we come back within one working day.