Housing scheme — Derbyshire
90-plot residential development supplied with sub-base and bedding, plus muckaway, on a fortnightly call-off.
Atlas Stone Supplies removes surplus dig, subsoil, clay, hardcore and made ground from sites across Nottingham and the wider East Midlands area. We classify the material where the disposal route isn't already confirmed, book the right vehicle for your access, and back-load aggregate on the return leg so you pay for one movement instead of two.
Most Nottingham customers are civils and housing contractors working on city-fringe development and warehousing pads, where 6F5 capping, Type 1 sub-base and grab muckaway do the heavy lifting.
Tipper and grab loads available across Nottinghamshire and Derbyshire within 24–72 hours. The East Midlands Airport corridor is served on standard lead times, with timed windows for city-centre sites by arrangement.
Around 16–20 tonnes per load — the standard workhorse for open sites with room to reverse and tip.
Lighter and shorter for restricted estate roads, narrow accesses and weight-limited routes.
Loads itself from a stockpile or verge with an extended-reach arm — no excavator needed on site.
Highest tonnage per movement for volume earthworks where access and hardstanding allow.
Material type, rough volume, site postcode and how a lorry gets in and out.
Classification if needed, then the licensed disposal or recovery facility and the vehicle that suits your access.
Phased to your dig rate, with duty-of-care transfer notes issued for every load.
All haulage runs under registered waste-carrier licences, with duty-of-care transfer notes for every load and WAC/WM3 documentation where the material requires classification.
Our credentialsMost Nottingham muckaway we plan involves grab muckaway off development and warehousing sites, so the disposal route is settled before the first lorry is booked rather than after a load is turned away. Warehousing pads and city-fringe development plots decide whether the job runs on tippers, grabs or a mix of both. The same routes reach Derby, Mansfield and Long Eaton, and where aggregate is going back in we load the return leg instead of running the lorry out empty.
90-plot residential development supplied with sub-base and bedding, plus muckaway, on a fortnightly call-off.
Where the material is already classified, Nottingham sites can normally be mobilised within a few working days. If WAC testing is needed first, allow time for sampling and lab turnaround before the first lorry moves.
Yes — two-way loads are the default on East Midlands jobs. The lorry tips your arisings at the facility and returns loaded with Type 1, capping or bedding stone, which cuts both vehicle movements and cost.
Yes. Every load leaves with a waste transfer note recording the carrier, the waste description and the receiving facility, so your site file stays compliant.
We sample to BS EN 14899, run UKAS WAC analysis and issue a WM3 hazard assessment, then route the material to a facility licensed to accept it. Nothing moves before the route is confirmed.
Yes. Most Nottinghamshire and Derbyshire housing schemes run on weekly or fortnightly call-off accounts with muckaway included.
Tell us the material, volume and access — we come back within one working day.