Muckaway — Wakefield
Clay and made ground cleared by grab from a town-centre plot after WAC classification, with capping back-loaded to form the working platform.
Atlas Stone Supplies removes surplus dig, subsoil, clay, hardcore and made ground from sites across Leeds and the wider West Yorkshire area. We classify the material where the disposal route isn't already confirmed, book the right vehicle for your access, and back-load aggregate on the return leg so you pay for one movement instead of two.
Our Yorkshire customers include groundworkers on South Bank regeneration plots, drainage subcontractors on adoption schemes and developers building out market-town sites who need muck off site before base can go down.
Short haulage routes from Yorkshire quarries and recycling facilities keep lead times tight — most stocked lines land within 24–72 hours. Tipper, grab and bulk-bag options across West and South Yorkshire.
Around 16–20 tonnes per load — the standard workhorse for open sites with room to reverse and tip.
Lighter and shorter for restricted estate roads, narrow accesses and weight-limited routes.
Loads itself from a stockpile or verge with an extended-reach arm — no excavator needed on site.
Highest tonnage per movement for volume earthworks where access and hardstanding allow.
Material type, rough volume, site postcode and how a lorry gets in and out.
Classification if needed, then the licensed disposal or recovery facility and the vehicle that suits your access.
Phased to your dig rate, with duty-of-care transfer notes issued for every load.
All haulage runs under registered waste-carrier licences, with duty-of-care transfer notes for every load and WAC/WM3 documentation where the material requires classification.
Our credentialsMost Leeds muckaway we plan involves muck that has to leave before base can go down, so the disposal route is settled before the first lorry is booked rather than after a load is turned away. Part-built estate roads and city-fringe plots with staged access decide whether the job runs on tippers, grabs or a mix of both. The same routes reach Bradford, Wakefield and Huddersfield, and where aggregate is going back in we load the return leg instead of running the lorry out empty.
Clay and made ground cleared by grab from a town-centre plot after WAC classification, with capping back-loaded to form the working platform.
Where the material is already classified, Leeds sites can normally be mobilised within a few working days. If WAC testing is needed first, allow time for sampling and lab turnaround before the first lorry moves.
Yes — two-way loads are the default on West Yorkshire jobs. The lorry tips your arisings at the facility and returns loaded with Type 1, capping or bedding stone, which cuts both vehicle movements and cost.
Yes. Every load leaves with a waste transfer note recording the carrier, the waste description and the receiving facility, so your site file stays compliant.
We sample to BS EN 14899, run UKAS WAC analysis and issue a WM3 hazard assessment, then route the material to a facility licensed to accept it. Nothing moves before the route is confirmed.
Yes — grab and tipper muckaway runs alongside supply, with WAC testing arranged where the material needs classifying before disposal.
Tell us the material, volume and access — we come back within one working day.