Civils package — Solihull
Phased Type 1 and 6F5 capping supply across a 14-month highways adoption scheme adjacent to a new logistics park.
Atlas Stone Supplies removes surplus dig, subsoil, clay, hardcore and made ground from sites across Birmingham and the wider West Midlands area. We classify the material where the disposal route isn't already confirmed, book the right vehicle for your access, and back-load aggregate on the return leg so you pay for one movement instead of two.
Our Birmingham customer base is heavily weighted toward civils and highways — Type 1 sub-base, 6F5 capping and certified pipe bedding make up the bulk of weekly volumes — with muckaway and WAC testing on the excavation side of the same jobs.
Tipper and grab loads available across the West Midlands within 24–48 hours. Direct quarry haulage from the Midlands stone belt keeps loads efficient on bulk orders, and grab collections are timed around delivery slots for two-way running.
Around 16–20 tonnes per load — the standard workhorse for open sites with room to reverse and tip.
Lighter and shorter for restricted estate roads, narrow accesses and weight-limited routes.
Loads itself from a stockpile or verge with an extended-reach arm — no excavator needed on site.
Highest tonnage per movement for volume earthworks where access and hardstanding allow.
Material type, rough volume, site postcode and how a lorry gets in and out.
Classification if needed, then the licensed disposal or recovery facility and the vehicle that suits your access.
Phased to your dig rate, with duty-of-care transfer notes issued for every load.
All haulage runs under registered waste-carrier licences, with duty-of-care transfer notes for every load and WAC/WM3 documentation where the material requires classification.
Our credentialsPhased Type 1 and 6F5 capping supply across a 14-month highways adoption scheme adjacent to a new logistics park.
Pipe bedding delivered in timed windows for a service diversion on a constrained conversion site.
85-plot development supplied with sub-base and bedding, and muckaway coordinated with the groundworks contractor on a fortnightly call-off.
Where the material is already classified, Birmingham sites can normally be mobilised within a few working days. If WAC testing is needed first, allow time for sampling and lab turnaround before the first lorry moves.
Yes — two-way loads are the default on West Midlands jobs. The lorry tips your arisings at the facility and returns loaded with Type 1, capping or bedding stone, which cuts both vehicle movements and cost.
Yes. Every load leaves with a waste transfer note recording the carrier, the waste description and the receiving facility, so your site file stays compliant.
We sample to BS EN 14899, run UKAS WAC analysis and issue a WM3 hazard assessment, then route the material to a facility licensed to accept it. Nothing moves before the route is confirmed.
Tell us the material, volume and access — we come back within one working day.