Link-road earthworks — Preston fringe
Capping and Type 1 delivered to a rolling daily target across a phased corridor build.
Atlas Stone Supplies removes surplus dig, subsoil, clay, hardcore and made ground from sites across Preston and the wider Lancashire area. We classify the material where the disposal route isn't already confirmed, book the right vehicle for your access, and back-load aggregate on the return leg so you pay for one movement instead of two.
Wet-weather working is the recurring theme in Lancashire — capping and geotextile platforms get used heavily, and programmes are planned so material lands when the site can take it. Infrastructure and link-road work takes volume sub-base; housing sites take phased bedding, sand and topsoil.
24–72 hours on stocked lines across PR postcodes. Artic loads for infrastructure and industrial platforms, 8-wheel tippers for estate work, grab and bulk bags for restricted access.
Around 16–20 tonnes per load — the standard workhorse for open sites with room to reverse and tip.
Lighter and shorter for restricted estate roads, narrow accesses and weight-limited routes.
Loads itself from a stockpile or verge with an extended-reach arm — no excavator needed on site.
Highest tonnage per movement for volume earthworks where access and hardstanding allow.
Material type, rough volume, site postcode and how a lorry gets in and out.
Classification if needed, then the licensed disposal or recovery facility and the vehicle that suits your access.
Phased to your dig rate, with duty-of-care transfer notes issued for every load.
All haulage runs under registered waste-carrier licences, with duty-of-care transfer notes for every load and WAC/WM3 documentation where the material requires classification.
Our credentialsCapping and Type 1 delivered to a rolling daily target across a phased corridor build.
6F5 capping supplied to build working platforms during a wet-weather window.
Hardcore grab-loaded away with recycled sub-base back-loaded on the return leg.
Where the material is already classified, Preston sites can normally be mobilised within a few working days. If WAC testing is needed first, allow time for sampling and lab turnaround before the first lorry moves.
Yes — two-way loads are the default on Lancashire jobs. The lorry tips your arisings at the facility and returns loaded with Type 1, capping or bedding stone, which cuts both vehicle movements and cost.
Yes. Every load leaves with a waste transfer note recording the carrier, the waste description and the receiving facility, so your site file stays compliant.
We sample to BS EN 14899, run UKAS WAC analysis and issue a WM3 hazard assessment, then route the material to a facility licensed to accept it. Nothing moves before the route is confirmed.
Tell us the material, volume and access — we come back within one working day.