Housing platform — Great Haddon
Capping delivered to a daily tonnage target to build working platforms over soft fen-edge ground.
Atlas Stone Supplies removes surplus dig, subsoil, clay, hardcore and made ground from sites across Peterborough and the wider Cambridgeshire area. We classify the material where the disposal route isn't already confirmed, book the right vehicle for your access, and back-load aggregate on the return leg so you pay for one movement instead of two.
Fen-edge ground conditions push a lot of Peterborough work towards capping and geotextile working platforms before any sub-base goes down, so 6F5 and 6F2 move in volume here. Plot-scale drainage packages take bedding stone in daily call-offs, and land-drainage and soil-import work draws on BS3882 topsoil through the growing season.
Stocked lines are typically delivered within 24–72 hours across PE postcodes. Artic and 8-wheel tipper loads for volume earthworks on the A1/A47 corridors; grab and bulk bags for restricted plots in the city centre and older suburbs.
Around 16–20 tonnes per load — the standard workhorse for open sites with room to reverse and tip.
Lighter and shorter for restricted estate roads, narrow accesses and weight-limited routes.
Loads itself from a stockpile or verge with an extended-reach arm — no excavator needed on site.
Highest tonnage per movement for volume earthworks where access and hardstanding allow.
Material type, rough volume, site postcode and how a lorry gets in and out.
Classification if needed, then the licensed disposal or recovery facility and the vehicle that suits your access.
Phased to your dig rate, with duty-of-care transfer notes issued for every load.
All haulage runs under registered waste-carrier licences, with duty-of-care transfer notes for every load and WAC/WM3 documentation where the material requires classification.
Our credentialsCapping delivered to a daily tonnage target to build working platforms over soft fen-edge ground.
Type 1 sub-base supplied in artic loads with phased call-offs around the slab pour programme.
Pipe bedding and pea shingle delivered to multiple field accesses across a single week.
Where the material is already classified, Peterborough sites can normally be mobilised within a few working days. If WAC testing is needed first, allow time for sampling and lab turnaround before the first lorry moves.
Yes — two-way loads are the default on Cambridgeshire jobs. The lorry tips your arisings at the facility and returns loaded with Type 1, capping or bedding stone, which cuts both vehicle movements and cost.
Yes. Every load leaves with a waste transfer note recording the carrier, the waste description and the receiving facility, so your site file stays compliant.
We sample to BS EN 14899, run UKAS WAC analysis and issue a WM3 hazard assessment, then route the material to a facility licensed to accept it. Nothing moves before the route is confirmed.
Tell us the material, volume and access — we come back within one working day.