Housing platform — Great Haddon
Capping delivered to a daily tonnage target to build working platforms over soft fen-edge ground.
Rigid tippers and artic bulk loads for aggregate delivery and muck away across Peterborough and Cambridgeshire. We match the vehicle to your access and weight limits, phase loads to your call-off dates, and run two-way movements wherever material is going both in and out.
Fen-edge ground conditions push a lot of Peterborough work towards capping and geotextile working platforms before any sub-base goes down, so 6F5 and 6F2 move in volume here. Plot-scale drainage packages take bedding stone in daily call-offs, and land-drainage and soil-import work draws on BS3882 topsoil through the growing season.
Stocked lines are typically delivered within 24–72 hours across PE postcodes. Artic and 8-wheel tipper loads for volume earthworks on the A1/A47 corridors; grab and bulk bags for restricted plots in the city centre and older suburbs.
Around 8 tonnes — for tight accesses, weight limits and small-volume drops.
Around 12 tonnes, a good compromise on estate roads and part-built sites.
Around 16–20 tonnes, the standard bulk vehicle for open construction sites.
Up to around 29 tonnes per load for the lowest cost per tonne where access and hardstanding allow.
What's moving, how much, and whether a rigid or artic can safely get in and turn.
Single drop, day rate or a load-per-day programme sequenced to your site.
Timed windows where required, with paperwork for both delivered material and removed waste.
Haulage operates under an O-licence with registered waste-carrier cover for removal work, and weighbridge tickets are supplied for delivered and removed tonnage.
Our credentialsCapping delivered to a daily tonnage target to build working platforms over soft fen-edge ground.
Type 1 sub-base supplied in artic loads with phased call-offs around the slab pour programme.
Pipe bedding and pea shingle delivered to multiple field accesses across a single week.
Stocked lines are typically delivered within 24–72 hours across PE postcodes. Artic and 8-wheel tipper loads for volume earthworks on the A1/A47 corridors; grab and bulk bags for restricted plots in the city centre and older suburbs. If you're unsure, send us the access details and we'll specify the largest vehicle that can safely get in and discharge.
Yes — timed slots, booked gate systems, night and weekend windows are all workable where the site requires them.
Yes. On volume earthworks we plan a load-per-day schedule so the platform build keeps pace with your programme rather than arriving all at once.
Yes — a two-way load takes arisings off site and returns with aggregate. It halves the movements through Peterborough and is normally the cheapest way to run the job.
Tell us the material, volume and access — we come back within one working day.