Growth area — Beaulieu
Estate-road sub-base and plot topsoil delivered to a rolling handover programme.
Atlas Stone Supplies removes surplus dig, subsoil, clay, hardcore and made ground from sites across Chelmsford and the wider Essex area. We classify the material where the disposal route isn't already confirmed, book the right vehicle for your access, and back-load aggregate on the return leg so you pay for one movement instead of two.
Growth-area housing dominates: drainage packages, estate roads and plot finishing on a rolling programme. City-centre regeneration adds constrained, permit-controlled drops. London clay arisings are the norm, so classification and muckaway routing are planned alongside supply rather than after it.
Stocked lines within 24–72 hours across CM postcodes. Artic loads for A12-corridor commercial sites, 8-wheel tippers and grab for estate and city-centre work.
Around 16–20 tonnes per load — the standard workhorse for open sites with room to reverse and tip.
Lighter and shorter for restricted estate roads, narrow accesses and weight-limited routes.
Loads itself from a stockpile or verge with an extended-reach arm — no excavator needed on site.
Highest tonnage per movement for volume earthworks where access and hardstanding allow.
Material type, rough volume, site postcode and how a lorry gets in and out.
Classification if needed, then the licensed disposal or recovery facility and the vehicle that suits your access.
Phased to your dig rate, with duty-of-care transfer notes issued for every load.
All haulage runs under registered waste-carrier licences, with duty-of-care transfer notes for every load and WAC/WM3 documentation where the material requires classification.
Our credentialsEstate-road sub-base and plot topsoil delivered to a rolling handover programme.
Grab drops of bedding stone through a permit-controlled loading window.
Capping delivered in artic loads with clay arisings removed under duty-of-care transfer notes.
Where the material is already classified, Chelmsford sites can normally be mobilised within a few working days. If WAC testing is needed first, allow time for sampling and lab turnaround before the first lorry moves.
Yes — two-way loads are the default on Essex jobs. The lorry tips your arisings at the facility and returns loaded with Type 1, capping or bedding stone, which cuts both vehicle movements and cost.
Yes. Every load leaves with a waste transfer note recording the carrier, the waste description and the receiving facility, so your site file stays compliant.
We sample to BS EN 14899, run UKAS WAC analysis and issue a WM3 hazard assessment, then route the material to a facility licensed to accept it. Nothing moves before the route is confirmed.
Tell us the material, volume and access — we come back within one working day.