Distribution unit — Basingstoke fringe
Type 1 and 6F5 capping delivered in artic loads across a phased platform build.
Atlas Stone Supplies removes surplus dig, subsoil, clay, hardcore and made ground from sites across Basingstoke and the wider Hampshire area. We classify the material where the disposal route isn't already confirmed, book the right vehicle for your access, and back-load aggregate on the return leg so you pay for one movement instead of two.
Chalk subgrade is the local factor — arisings often behave differently to the clay further east, and capping choice matters on wet-weather working platforms. Business-park and distribution work runs on artic loads to programme; housing sites take phased plot-level bedding, sand and topsoil.
24–72 hours on stocked lines across RG21–RG29 postcodes. Artic loads for business-park earthworks, 8-wheel tippers for estate roads, grab and bulk bags for tight plots and landscaping.
Around 16–20 tonnes per load — the standard workhorse for open sites with room to reverse and tip.
Lighter and shorter for restricted estate roads, narrow accesses and weight-limited routes.
Loads itself from a stockpile or verge with an extended-reach arm — no excavator needed on site.
Highest tonnage per movement for volume earthworks where access and hardstanding allow.
Material type, rough volume, site postcode and how a lorry gets in and out.
Classification if needed, then the licensed disposal or recovery facility and the vehicle that suits your access.
Phased to your dig rate, with duty-of-care transfer notes issued for every load.
All haulage runs under registered waste-carrier licences, with duty-of-care transfer notes for every load and WAC/WM3 documentation where the material requires classification.
Our credentialsType 1 and 6F5 capping delivered in artic loads across a phased platform build.
Bedding stone called off plot by plot alongside the estate-road programme.
Surplus chalk classified and removed to a licensed recovery facility with recycled Type 1 back-loaded.
Where the material is already classified, Basingstoke sites can normally be mobilised within a few working days. If WAC testing is needed first, allow time for sampling and lab turnaround before the first lorry moves.
Yes — two-way loads are the default on Hampshire jobs. The lorry tips your arisings at the facility and returns loaded with Type 1, capping or bedding stone, which cuts both vehicle movements and cost.
Yes. Every load leaves with a waste transfer note recording the carrier, the waste description and the receiving facility, so your site file stays compliant.
We sample to BS EN 14899, run UKAS WAC analysis and issue a WM3 hazard assessment, then route the material to a facility licensed to accept it. Nothing moves before the route is confirmed.
Tell us the material, volume and access — we come back within one working day.