Housing phase — north Colchester
Estate-road Type 1 and plot topsoil delivered against a rolling handover schedule.
Grab lorries for muckaway, hardcore and site clearance across Colchester and Essex. A grab loads itself from a stockpile, verge or trench spoil heap, so you don't need an excavator standing by — and the same lorry can return loaded with aggregate to keep movements down.
A lot of local work is residential-led drainage and estate roads, so bedding stone and Type 1 move in phased call-offs rather than single big drops. Archaeology-sensitive plots around the historic core need careful sequencing, and clay arisings usually require classification before disposal.
24–72 hours on stocked lines across CO postcodes. 8-wheel tippers for estate work, artic loads for larger platforms, grab and bulk bags for constrained town-centre plots.
Around 12 tonnes — better for narrow residential streets and weight-restricted accesses.
Around 16 tonnes per load, the standard choice for construction and groundworks clearance.
Loads over a boundary, hedge or hoarding where the lorry can't get alongside the heap.
Lorry stays on site while your machine loads it, for jobs with limited stockpile space.
What's being loaded, where it sits and how far the arm needs to reach from the road.
6- or 8-wheel, standard or extended reach, sized to your access and weight limits.
Single load, day rate or phased across a programme, with transfer notes issued each time.
Grab haulage runs under registered waste-carrier licences with duty-of-care transfer notes per load, and drivers hold current CPC and site-safety accreditation.
Our credentialsEstate-road Type 1 and plot topsoil delivered against a rolling handover schedule.
Pipe bedding 4/20 supplied in daily call-offs around a live campus access route.
WAC-classified clay removed by tipper with recycled capping back-loaded.
An 8-wheel grab carries roughly 16 tonnes per load and a 6-wheel around 12 tonnes. On tighter Colchester streets the 6-wheel is often the only option that can get alongside the heap.
A standard arm works to around 6–8 metres from the lorry; extended-reach machines go further and can load over a wall, hedge or hoarding. Tell us the distance and we'll match the machine.
No — that's the main advantage of a grab. It loads itself, so you don't pay for a machine and operator to stand idle waiting for lorries.
Yes. Two-way loads are standard: the grab tips your arisings at a licensed facility and returns with Type 1, capping or bedding stone for the same site.
Tell us the material, volume and access — we come back within one working day.