Housing phase — north Colchester
Estate-road Type 1 and plot topsoil delivered against a rolling handover schedule.
Soil sampling, UKAS WAC analysis and WM3 hazard assessment for sites across Colchester and Essex. Classification tells you where your arisings can legally go before you commit to a disposal route — which on most Colchester schemes is the difference between a straightforward muckaway and a stopped programme.
A lot of local work is residential-led drainage and estate roads, so bedding stone and Type 1 move in phased call-offs rather than single big drops. Archaeology-sensitive plots around the historic core need careful sequencing, and clay arisings usually require classification before disposal.
24–72 hours on stocked lines across CO postcodes. 8-wheel tippers for estate work, artic loads for larger platforms, grab and bulk bags for constrained town-centre plots.
Basic classification screen to confirm whether material is inert, non-hazardous or hazardous.
Complete leachate analysis for landfill acceptance where the facility requires it.
Our sampler attends, takes representative samples across the stockpile or dig and logs the locations.
Accelerated lab options from around 24 hours where the programme can't wait.
Representative samples taken to BS EN 14899 across the material to be moved.
UKAS lab runs the agreed suite, from screen through to full WAC leachate testing.
WM3 assessment issued, then we confirm the licensed facility that can accept the material.
Sampling follows BS EN 14899, leachate testing follows BS EN 12457-3 and analysis is carried out by UKAS-accredited laboratories, with WM3 assessment reports for your site file.
Our credentialsEstate-road Type 1 and plot topsoil delivered against a rolling handover schedule.
Pipe bedding 4/20 supplied in daily call-offs around a live campus access route.
WAC-classified clay removed by tipper with recycled capping back-loaded.
A licensed facility can only accept material it's permitted to take. Testing classifies the arisings from your Colchester dig so the right facility is booked first time, rather than a lorry being turned away and the programme slipping.
Standard turnaround is typically around five working days from sample receipt, with accelerated options from about 24 hours where the programme demands it.
Either. We can attend site and sample to BS EN 14899, or run the analysis on samples you've taken yourself if the sampling regime is sound.
Yes — that's the usual approach. We test first, confirm the route, then mobilise haulage to the licensed facility so there's no gap between classification and removal.
Tell us the material, volume and access — we come back within one working day.