6F5 Capping delivered in Southampton
6F5 is a coarse graded capping material to Specification for Highway Works Clause 613, used to build a working platform over weak subgrades before the sub-base goes down. On soft ground it is far more economical than importing extra Type 1, and it spreads and compacts into a stable layer that protects the formation through the wet.
Into Southampton and across South East we supply it loose by tipper, by grab lorry where a stockpile has to be loaded or reached over a boundary, or in bulk bags for plots a lorry can't discharge into. Tipper and grab loads across Southampton, Portsmouth, Eastleigh and Winchester within 24–72 hours. Artic tonnage for larger earthworks packages by arrangement.
Specification
- Grading
- Coarse graded, nominal 0–125 mm
- Specification
- SHW Clause 613 capping (Class 6F5)
- Material
- Primary crushed rock
- Typical layer thickness
- Commonly 300–600 mm, per design
- Supply formats
- Loose tipper, artic bulk loads
- Typical load
- 16–20 t tipper, 28–29 t artic
Lead time
Stocked line — most postcodes in England and Wales are dispatched within 24–72 hours of order confirmation. Scotland and Highland deliveries are typically 3–5 working days. Programmed civils schedules are booked in advance and delivered to your call-off dates.
Typical uses on Southampton sites
- Capping layer over weak or CBR-deficient subgrades
- Temporary haul roads and site working platforms
- Highways and adopted road construction to SHW spec
- Bulk fill and level-up on earthworks schemes
Coastal and port-adjacent sites often need marine-grade shingle and free-draining fill alongside standard civils sub-base, plus reliable disposal routes for made ground.
What shapes 6F5 Capping supply in Southampton
Port-adjacent ground needing free-draining fill is exactly why 6F5 Capping moves in volume around Southampton — it builds a working platform that takes plant and lorry traffic before any sub-base goes down. Port and coastal estates with controlled vehicle movements decide whether it arrives by tipper, grab or bulk bag. Where the same site is also producing made ground needing a reliable, pre-confirmed disposal route, we plan the removal and the delivery together so the lorry is not running one leg empty. The same routes serve Portsmouth, Eastleigh and Winchester.
Questions we get asked
What is the difference between 6F5 and 6F2 capping?
Both are capping materials under SHW Clause 613. 6F5 is typically a coarser graded fill used where a thicker, robust platform is needed; 6F2 is the finer of the two gradings and is widely used as general capping fill. Follow your earthworks specification for which class is required.
How thick should a 6F5 capping layer be?
Thickness is a design decision based on subgrade CBR and the loading above — commonly 300–600 mm. Your geotechnical engineer should specify it; we supply the tonnage against the design.
Do you cover the Isle of Wight?
Mainland Hampshire is standard coverage; Island deliveries are quoted case by case including ferry haulage.
Material out as well as in, around Southampton
Most deliveries into Southampton pair with a removal: the lorry takes your arisings to a licensed facility and comes back loaded, so you pay for one movement rather than two.
Need 6f5 capping in Southampton?
Send us the tonnage, postcode and access — quote back within one working day.
