West Yorkshire

6F5 Capping delivered in Leeds

6F5 is a coarse graded capping material to Specification for Highway Works Clause 613, used to build a working platform over weak subgrades before the sub-base goes down. On soft ground it is far more economical than importing extra Type 1, and it spreads and compacts into a stable layer that protects the formation through the wet.

Into Leeds and across West Yorkshire we supply it loose by tipper, by grab lorry where a stockpile has to be loaded or reached over a boundary, or in bulk bags for plots a lorry can't discharge into. Short haulage routes from Yorkshire quarries and recycling facilities keep lead times tight — most stocked lines land within 24–72 hours. Tipper, grab and bulk-bag options across West and South Yorkshire.

Specification

Grading
Coarse graded, nominal 0–125 mm
Specification
SHW Clause 613 capping (Class 6F5)
Material
Primary crushed rock
Typical layer thickness
Commonly 300–600 mm, per design
Supply formats
Loose tipper, artic bulk loads
Typical load
16–20 t tipper, 28–29 t artic

Lead time

Stocked line — most postcodes in England and Wales are dispatched within 24–72 hours of order confirmation. Scotland and Highland deliveries are typically 3–5 working days. Programmed civils schedules are booked in advance and delivered to your call-off dates.

Typical uses on Leeds sites

  • Capping layer over weak or CBR-deficient subgrades
  • Temporary haul roads and site working platforms
  • Highways and adopted road construction to SHW spec
  • Bulk fill and level-up on earthworks schemes

Our Yorkshire customers include groundworkers on South Bank regeneration plots, drainage subcontractors on adoption schemes and developers building out market-town sites who need muck off site before base can go down.

What shapes 6F5 Capping supply in Leeds

Made ground on South Bank regeneration plots is exactly why 6F5 Capping moves in volume around Leeds — it builds a working platform that takes plant and lorry traffic before any sub-base goes down. Part-built estate roads and city-fringe plots with staged access decide whether it arrives by tipper, grab or bulk bag. Where the same site is also producing muck that has to leave before base can go down, we plan the removal and the delivery together so the lorry is not running one leg empty. The same routes serve Bradford, Wakefield and Huddersfield.

Questions we get asked

What is the difference between 6F5 and 6F2 capping?

Both are capping materials under SHW Clause 613. 6F5 is typically a coarser graded fill used where a thicker, robust platform is needed; 6F2 is the finer of the two gradings and is widely used as general capping fill. Follow your earthworks specification for which class is required.

How thick should a 6F5 capping layer be?

Thickness is a design decision based on subgrade CBR and the loading above — commonly 300–600 mm. Your geotechnical engineer should specify it; we supply the tonnage against the design.

How quickly can you get bedding stone to a Leeds site?

Stocked bedding sizes are usually on site within 24–48 hours, and same-day is often possible for orders placed early in the day.

Material out as well as in, around Leeds

Most deliveries into Leeds pair with a removal: the lorry takes your arisings to a licensed facility and comes back loaded, so you pay for one movement rather than two.

Need 6f5 capping in Leeds?

Send us the tonnage, postcode and access — quote back within one working day.

Build an RFQ

Other lines delivered to Leeds

6F5 Capping in other cities

Full 6F5 Capping specification