6F5 Capping delivered in London
6F5 is a coarse graded capping material to Specification for Highway Works Clause 613, used to build a working platform over weak subgrades before the sub-base goes down. On soft ground it is far more economical than importing extra Type 1, and it spreads and compacts into a stable layer that protects the formation through the wet.
Into London and across Greater London we supply it loose by tipper, by grab lorry where a stockpile has to be loaded or reached over a boundary, or in bulk bags for plots a lorry can't discharge into. Same-week dispatch on stocked lines to all 32 boroughs and the City, with most orders on site within 24–72 hours. Tipper, grab, HIAB and bulk-bag options for restricted-access sites in Zones 1–2, plus night and weekend windows where daytime access is not practical.
Specification
- Grading
- Coarse graded, nominal 0–125 mm
- Specification
- SHW Clause 613 capping (Class 6F5)
- Material
- Primary crushed rock
- Typical layer thickness
- Commonly 300–600 mm, per design
- Supply formats
- Loose tipper, artic bulk loads
- Typical load
- 16–20 t tipper, 28–29 t artic
Lead time
Stocked line — most postcodes in England and Wales are dispatched within 24–72 hours of order confirmation. Scotland and Highland deliveries are typically 3–5 working days. Programmed civils schedules are booked in advance and delivered to your call-off dates.
Typical uses on London sites
- Capping layer over weak or CBR-deficient subgrades
- Temporary haul roads and site working platforms
- Highways and adopted road construction to SHW spec
- Bulk fill and level-up on earthworks schemes
London demands a supplier that understands logistics as well as materials. Most central drops are timed to 30-minute windows with grab or HIAB access, and our hauliers operate FORS Silver, ULEZ and DVS-compliant vehicles for schemes that require compliant transport. Muckaway is the other half of the job here — constrained sites need muck off before stone can come on.
What shapes 6F5 Capping supply in London
London clay and deep made ground under most central plots is exactly why 6F5 Capping moves in volume around London — it builds a working platform that takes plant and lorry traffic before any sub-base goes down. Timed 30-minute delivery windows, ULEZ and DVS-compliant vehicles and single-lane mews accesses decide whether it arrives by tipper, grab or bulk bag. Where the same site is also producing clay and made ground that usually needs classifying before a disposal route can be booked, we plan the removal and the delivery together so the lorry is not running one leg empty. The same routes serve Croydon, Watford and Romford.
Questions we get asked
What is the difference between 6F5 and 6F2 capping?
Both are capping materials under SHW Clause 613. 6F5 is typically a coarser graded fill used where a thicker, robust platform is needed; 6F2 is the finer of the two gradings and is widely used as general capping fill. Follow your earthworks specification for which class is required.
How thick should a 6F5 capping layer be?
Thickness is a design decision based on subgrade CBR and the loading above — commonly 300–600 mm. Your geotechnical engineer should specify it; we supply the tonnage against the design.
Do you deliver inside the Congestion Charge zone?
Yes — we run ULEZ and DVS-compliant vehicles and coordinate Zone 1 drops around the 07:00–22:00 charging window, or schedule night deliveries for low-disruption sites.
Material out as well as in, around London
Most deliveries into London pair with a removal: the lorry takes your arisings to a licensed facility and comes back loaded, so you pay for one movement rather than two.
Need 6f5 capping in London?
Send us the tonnage, postcode and access — quote back within one working day.
