6F5 Capping delivered in Milton Keynes
6F5 is a coarse graded capping material to Specification for Highway Works Clause 613, used to build a working platform over weak subgrades before the sub-base goes down. On soft ground it is far more economical than importing extra Type 1, and it spreads and compacts into a stable layer that protects the formation through the wet.
Into Milton Keynes and across South East we supply it loose by tipper, by grab lorry where a stockpile has to be loaded or reached over a boundary, or in bulk bags for plots a lorry can't discharge into. Tipper and grab loads across Milton Keynes, Bletchley and north Bucks within 24–72 hours on stocked lines. Skips and grabs coordinated for grid-square sites with easy roadside access.
Specification
- Grading
- Coarse graded, nominal 0–125 mm
- Specification
- SHW Clause 613 capping (Class 6F5)
- Material
- Primary crushed rock
- Typical layer thickness
- Commonly 300–600 mm, per design
- Supply formats
- Loose tipper, artic bulk loads
- Typical load
- 16–20 t tipper, 28–29 t artic
Lead time
Stocked line — most postcodes in England and Wales are dispatched within 24–72 hours of order confirmation. Scotland and Highland deliveries are typically 3–5 working days. Programmed civils schedules are booked in advance and delivered to your call-off dates.
Typical uses on Milton Keynes sites
- Capping layer over weak or CBR-deficient subgrades
- Temporary haul roads and site working platforms
- Highways and adopted road construction to SHW spec
- Bulk fill and level-up on earthworks schemes
A mix of large residential parcels and fit-out-scale groundworks. Our MK customers typically combine staged aggregate deliveries with skips and grab loads on the same site programme.
What shapes 6F5 Capping supply in Milton Keynes
Generally workable ground on large residential parcels is exactly why 6F5 Capping moves in volume around Milton Keynes — it builds a working platform that takes plant and lorry traffic before any sub-base goes down. Grid-road access with straightforward site entry on most parcels decide whether it arrives by tipper, grab or bulk bag. Where the same site is also producing skips and grab loads running alongside staged deliveries, we plan the removal and the delivery together so the lorry is not running one leg empty. The same routes serve Bletchley, Newport Pagnell and Bedford.
Questions we get asked
What is the difference between 6F5 and 6F2 capping?
Both are capping materials under SHW Clause 613. 6F5 is typically a coarser graded fill used where a thicker, robust platform is needed; 6F2 is the finer of the two gradings and is widely used as general capping fill. Follow your earthworks specification for which class is required.
How thick should a 6F5 capping layer be?
Thickness is a design decision based on subgrade CBR and the loading above — commonly 300–600 mm. Your geotechnical engineer should specify it; we supply the tonnage against the design.
Do you deliver to Bedford and Aylesbury too?
Yes — Bedford, Aylesbury, Buckingham and Leighton Buzzard are all served from our Milton Keynes haulage network.
Material out as well as in, around Milton Keynes
Most deliveries into Milton Keynes pair with a removal: the lorry takes your arisings to a licensed facility and comes back loaded, so you pay for one movement rather than two.