Residential parcel — Western Expansion Area
Staged sub-base and bedding deliveries against a plot-by-plot groundworks programme.
Soil sampling, UKAS WAC analysis and WM3 hazard assessment for sites across Milton Keynes and South East. Classification tells you where your arisings can legally go before you commit to a disposal route — which on most Milton Keynes schemes is the difference between a straightforward muckaway and a stopped programme.
A mix of large residential parcels and fit-out-scale groundworks. Our MK customers typically combine staged aggregate deliveries with skips and grab loads on the same site programme.
Tipper and grab loads across Milton Keynes, Bletchley and north Bucks within 24–72 hours on stocked lines. Skips and grabs coordinated for grid-square sites with easy roadside access.
Basic classification screen to confirm whether material is inert, non-hazardous or hazardous.
Complete leachate analysis for landfill acceptance where the facility requires it.
Our sampler attends, takes representative samples across the stockpile or dig and logs the locations.
Accelerated lab options from around 24 hours where the programme can't wait.
Representative samples taken to BS EN 14899 across the material to be moved.
UKAS lab runs the agreed suite, from screen through to full WAC leachate testing.
WM3 assessment issued, then we confirm the licensed facility that can accept the material.
Sampling follows BS EN 14899, leachate testing follows BS EN 12457-3 and analysis is carried out by UKAS-accredited laboratories, with WM3 assessment reports for your site file.
Our credentialsStaged sub-base and bedding deliveries against a plot-by-plot groundworks programme.
Type 1 and capping supplied for a yard regrade, with the arisings removed on two-way loads.
Pipe bedding in timed loads to a live-highway drainage scheme.
A licensed facility can only accept material it's permitted to take. Testing classifies the arisings from your Milton Keynes dig so the right facility is booked first time, rather than a lorry being turned away and the programme slipping.
Standard turnaround is typically around five working days from sample receipt, with accelerated options from about 24 hours where the programme demands it.
Either. We can attend site and sample to BS EN 14899, or run the analysis on samples you've taken yourself if the sampling regime is sound.
Yes — that's the usual approach. We test first, confirm the route, then mobilise haulage to the licensed facility so there's no gap between classification and removal.
Tell us the material, volume and access — we come back within one working day.