Port-side yard — Southampton docks
Capping and sub-base supplied for a hardstanding regrade with tight vehicle-movement controls.
Skip hire across Southampton and South East, from 4-yard midi skips for small strip-outs to 40-yard roll-on/roll-off containers for volume construction waste. We arrange highway permits where the skip has to sit on the road, and everything goes to a licensed transfer station with a waste transfer note.
Coastal and port-adjacent sites often need marine-grade shingle and free-draining fill alongside standard civils sub-base, plus reliable disposal routes for made ground.
Tipper and grab loads across Southampton, Portsmouth, Eastleigh and Winchester within 24–72 hours. Artic tonnage for larger earthworks packages by arrangement.
Small refurbishments and garden clearances where space is tight.
The standard construction skip for mixed builders' waste and small strip-outs.
Bulky, lighter waste — timber, packaging and fit-out arisings.
Volume waste on active construction sites with room for a roll-on/roll-off.
Tell us what's going in and where the skip can stand — road or private ground.
Where the skip sits on the highway we apply to the council for the permit on your behalf.
Booked exchanges keep work moving, with a transfer note for every container.
All containers go to licensed transfer stations, with waste transfer notes issued for every collection and recovery rates reported on request.
Our credentialsCapping and sub-base supplied for a hardstanding regrade with tight vehicle-movement controls.
Bedding, sub-base and topsoil supplied on a weekly call-off across a phased plot release.
Arisings sampled and WAC-tested, then removed to the correct permitted facility with full paperwork.
If the skip stands on a public road or verge in Southampton you need a highway permit from the local authority. We apply for it on your behalf — allow a few working days. On private ground or a driveway no permit is needed.
No asbestos, gas cylinders, tyres, batteries, liquids, paint, fridges or other hazardous items. Tell us if any are present and we'll arrange a compliant separate route.
For soil, muck and hardcore in any quantity a grab or tipper usually moves more material per movement than skips. Skips suit mixed construction and strip-out waste.
Usually within 24–48 hours across Southampton on private-ground drops. Add a few days where a highway permit has to be issued first.
Tell us the material, volume and access — we come back within one working day.