Port-side yard — Southampton docks
Capping and sub-base supplied for a hardstanding regrade with tight vehicle-movement controls.
Southampton's port, marine and residential development work keeps groundworkers supplied year-round. Atlas Stone Supplies covers Southampton, Portsmouth and Hampshire with bulk aggregates, topsoil, muckaway and skip hire.
Coastal and port-adjacent sites often need marine-grade shingle and free-draining fill alongside standard civils sub-base, plus reliable disposal routes for made ground.
Tipper and grab loads across Southampton, Portsmouth, Eastleigh and Winchester within 24–72 hours. Artic tonnage for larger earthworks packages by arrangement.
Full specs, typical uses and lead-time notes for every stocked line, plus the waste services we run alongside delivery in South East.
Capping and sub-base supplied for a hardstanding regrade with tight vehicle-movement controls.
Bedding, sub-base and topsoil supplied on a weekly call-off across a phased plot release.
Arisings sampled and WAC-tested, then removed to the correct permitted facility with full paperwork.
Our South East service also covers surrounding towns and trade-area villages on the same haulage routes.
Yes — we arrange sampling and UKAS WAC analysis, then route the material to a facility permitted to accept it.
Mainland Hampshire is standard coverage; Island deliveries are quoted case by case including ferry haulage.
Yes, granular free-draining fill and shingle are stocked for coastal and high-water-table sites.
Southampton, Eastleigh, Totton, Romsey, Winchester, Fareham and Portsmouth are core coverage, reaching along the M27 to Havant and up the M3 towards Basingstoke. Isle of Wight deliveries are quoted individually with ferry haulage included.
Stocked aggregates and topsoil generally arrive within 24–72 hours. Muckaway can start on the same timescale for clean, already-classified material; where made ground needs sampling and WAC analysis first, allow a few extra working days for the lab result before lorries roll.
Pricing and lead times within one working day.