6F2 Capping delivered in York
6F2 is a coarse recycled capping fill graded 0–125 mm, the most widely used capping material on UK earthworks. It builds a stable working platform over soft formations quickly and cheaply, and is the usual first import onto a site once the muckshift is under way.
Into York and across North Yorkshire we supply it loose by tipper, by grab lorry where a stockpile has to be loaded or reached over a boundary, or in bulk bags for plots a lorry can't discharge into. Stocked lines within 24–72 hours across YO postcodes. Timed early-morning windows for city-centre and conservation-area drops; tipper and artic loads for fringe, village and commercial schemes.
Specification
- Grading
- 0–125 mm coarse graded
- Specification
- Clause 613 capping (Class 6F2)
- Material
- Recycled crushed concrete and hardcore
- Typical layer thickness
- Commonly 250–500 mm, per design
- Supply formats
- Loose tipper, artic bulk loads
- Typical load
- 16–20 t tipper, 28–29 t artic
Lead time
Sourced from regional recycling facilities — typically 2–4 working days depending on postcode and depth of stock, with test data supplied on request. On larger schemes we hold production against your programme so call-offs stay on date.
Typical uses on York sites
- General capping fill over weak subgrades
- Site haul roads, compounds and crane platforms
- Bulk level-up and fill on earthworks schemes
- Piling mat build-up where design permits
Inside the walls, deliveries are timed, permitted and often grab or bulk-bag only. On the city fringe and at York Central it opens up to full loads and programmed earthworks. Flood-risk and archaeology conditions frequently dictate the sequence, so phased call-offs beat single bulk drops.
What shapes 6F2 Capping supply in York
River-terrace ground with flood-risk and archaeology conditions is exactly why 6F2 Capping moves in volume around York — it builds a working platform that takes plant and lorry traffic before any sub-base goes down. Timed, permitted, often grab or bulk-bag only inside the walls decide whether it arrives by tipper, grab or bulk bag. Where the same site is also producing arisings sequenced around flood-risk and archaeology conditions, we plan the removal and the delivery together so the lorry is not running one leg empty. The same routes serve Harrogate, Selby and Malton.
Questions we get asked
Is 6F2 the same as crusher run or hardcore?
They overlap in practice but are not interchangeable on paper. 6F2 is a specified capping grading under Clause 613 with defined limits, whereas 'hardcore' is a generic term. If your spec names 6F2, order 6F2 and we'll supply the supporting data.
Can 6F2 be used as a sub-base?
No — 6F2 is a capping material. For sub-base use MOT Type 1 to Clause 803, or recycled Type 1 where secondary aggregate is permitted.
Can you deliver inside York's city walls?
Yes — with timed, permitted windows and grab, HIAB or bulk-bag offload where a tipper cannot access or discharge.
Material out as well as in, around York
Most deliveries into York pair with a removal: the lorry takes your arisings to a licensed facility and comes back loaded, so you pay for one movement rather than two.
Need 6f2 capping in York?
Send us the tonnage, postcode and access — quote back within one working day.