6F5 is a coarse graded capping material to Specification for Highway Works Clause 613, used to build a working platform over weak subgrades before the sub-base goes down. On soft ground it is far more economical than importing extra Type 1, and it spreads and compacts into a stable layer that protects the formation through the wet.

Into Colchester and across Essex we supply it loose by tipper, by grab lorry where a stockpile has to be loaded or reached over a boundary, or in bulk bags for plots a lorry can't discharge into. 24–72 hours on stocked lines across CO postcodes. 8-wheel tippers for estate work, artic loads for larger platforms, grab and bulk bags for constrained town-centre plots.

Specification

Grading
Coarse graded, nominal 0–125 mm
Specification
SHW Clause 613 capping (Class 6F5)
Material
Primary crushed rock
Typical layer thickness
Commonly 300–600 mm, per design
Supply formats
Loose tipper, artic bulk loads
Typical load
16–20 t tipper, 28–29 t artic

Lead time

Stocked line — most postcodes in England and Wales are dispatched within 24–72 hours of order confirmation. Scotland and Highland deliveries are typically 3–5 working days. Programmed civils schedules are booked in advance and delivered to your call-off dates.

Typical uses on Colchester sites

  • Capping layer over weak or CBR-deficient subgrades
  • Temporary haul roads and site working platforms
  • Highways and adopted road construction to SHW spec
  • Bulk fill and level-up on earthworks schemes

A lot of local work is residential-led drainage and estate roads, so bedding stone and Type 1 move in phased call-offs rather than single big drops. Archaeology-sensitive plots around the historic core need careful sequencing, and clay arisings usually require classification before disposal.

What shapes 6F5 Capping supply in Colchester

Essex clay across most of the district is exactly why 6F5 Capping moves in volume around Colchester — it builds a working platform that takes plant and lorry traffic before any sub-base goes down. Phased residential call-offs rather than single large drops decide whether it arrives by tipper, grab or bulk bag. Where the same site is also producing clay arisings that usually require classification before disposal, we plan the removal and the delivery together so the lorry is not running one leg empty. The same routes serve Ipswich, Chelmsford and Clacton-on-Sea.

Questions we get asked

What is the difference between 6F5 and 6F2 capping?

Both are capping materials under SHW Clause 613. 6F5 is typically a coarser graded fill used where a thicker, robust platform is needed; 6F2 is the finer of the two gradings and is widely used as general capping fill. Follow your earthworks specification for which class is required.

How thick should a 6F5 capping layer be?

Thickness is a design decision based on subgrade CBR and the loading above — commonly 300–600 mm. Your geotechnical engineer should specify it; we supply the tonnage against the design.

Which north Essex areas do you cover?

Colchester, Braintree, Witham, Halstead, Clacton and Sudbury, plus Chelmsford and Ipswich on the same routes.

Material out as well as in, around Colchester

Most deliveries into Colchester pair with a removal: the lorry takes your arisings to a licensed facility and comes back loaded, so you pay for one movement rather than two.

Need 6f5 capping in Colchester?

Send us the tonnage, postcode and access — quote back within one working day.