Yorkshire & the Humber

6F5 Capping delivered in Hull

6F5 is a coarse graded capping material to Specification for Highway Works Clause 613, used to build a working platform over weak subgrades before the sub-base goes down. On soft ground it is far more economical than importing extra Type 1, and it spreads and compacts into a stable layer that protects the formation through the wet.

Into Hull and across Yorkshire & the Humber we supply it loose by tipper, by grab lorry where a stockpile has to be loaded or reached over a boundary, or in bulk bags for plots a lorry can't discharge into. Tipper, grab and artic loads across Hull, Beverley, Goole and Grimsby, typically within 24–72 hours on stocked lines.

Specification

Grading
Coarse graded, nominal 0–125 mm
Specification
SHW Clause 613 capping (Class 6F5)
Material
Primary crushed rock
Typical layer thickness
Commonly 300–600 mm, per design
Supply formats
Loose tipper, artic bulk loads
Typical load
16–20 t tipper, 28–29 t artic

Lead time

Stocked line — most postcodes in England and Wales are dispatched within 24–72 hours of order confirmation. Scotland and Highland deliveries are typically 3–5 working days. Programmed civils schedules are booked in advance and delivered to your call-off dates.

Typical uses on Hull sites

  • Capping layer over weak or CBR-deficient subgrades
  • Temporary haul roads and site working platforms
  • Highways and adopted road construction to SHW spec
  • Bulk fill and level-up on earthworks schemes

Low-lying ground and port-side hardstanding mean capping and free-draining granular fill are core, with artic tonnage for the larger energy and logistics platforms.

What shapes 6F5 Capping supply in Hull

Low-lying Humber ground and port-side hardstanding is exactly why 6F5 Capping moves in volume around Hull — it builds a working platform that takes plant and lorry traffic before any sub-base goes down. Port estates with controlled vehicle movements plus open energy-corridor plots decide whether it arrives by tipper, grab or bulk bag. Where the same site is also producing wet clay arisings that need sheeting in transit and tip acceptance confirmed first, we plan the removal and the delivery together so the lorry is not running one leg empty. The same routes serve Beverley, Goole and Grimsby.

Questions we get asked

What is the difference between 6F5 and 6F2 capping?

Both are capping materials under SHW Clause 613. 6F5 is typically a coarser graded fill used where a thicker, robust platform is needed; 6F2 is the finer of the two gradings and is widely used as general capping fill. Follow your earthworks specification for which class is required.

How thick should a 6F5 capping layer be?

Thickness is a design decision based on subgrade CBR and the loading above — commonly 300–600 mm. Your geotechnical engineer should specify it; we supply the tonnage against the design.

Do you cover North Lincolnshire?

Yes, Grimsby, Scunthorpe and the south bank are inside our Humber haulage network.

Material out as well as in, around Hull

Most deliveries into Hull pair with a removal: the lorry takes your arisings to a licensed facility and comes back loaded, so you pay for one movement rather than two.

Need 6f5 capping in Hull?

Send us the tonnage, postcode and access — quote back within one working day.

Build an RFQ

Other lines delivered to Hull

6F5 Capping in other cities

Full 6F5 Capping specification