Brownfield platform — Stoke
Made ground classified and removed, then 6F5 capping supplied to form the working platform.
Rigid tippers and artic bulk loads for aggregate delivery and muck away across Stoke-on-Trent and West Midlands. We match the vehicle to your access and weight limits, phase loads to your call-off dates, and run two-way movements wherever material is going both in and out.
Former industrial land means made ground, variable arisings and a real need for correct classification before disposal — followed by capping and sub-base to build a workable platform.
Tipper, grab and artic loads across Stoke, Newcastle-under-Lyme, Stafford and Crewe within 24–72 hours on stocked lines.
Around 8 tonnes — for tight accesses, weight limits and small-volume drops.
Around 12 tonnes, a good compromise on estate roads and part-built sites.
Around 16–20 tonnes, the standard bulk vehicle for open construction sites.
Up to around 29 tonnes per load for the lowest cost per tonne where access and hardstanding allow.
What's moving, how much, and whether a rigid or artic can safely get in and turn.
Single drop, day rate or a load-per-day programme sequenced to your site.
Timed windows where required, with paperwork for both delivered material and removed waste.
Haulage operates under an O-licence with registered waste-carrier cover for removal work, and weighbridge tickets are supplied for delivered and removed tonnage.
Our credentialsMade ground classified and removed, then 6F5 capping supplied to form the working platform.
Bulk Type 1 and capping delivered against a phased earthworks programme.
Sub-base and bedding supplied on call-off for an adopted estate-road package.
Tipper, grab and artic loads across Stoke, Newcastle-under-Lyme, Stafford and Crewe within 24–72 hours on stocked lines. If you're unsure, send us the access details and we'll specify the largest vehicle that can safely get in and discharge.
Yes — timed slots, booked gate systems, night and weekend windows are all workable where the site requires them.
Yes. On volume earthworks we plan a load-per-day schedule so the platform build keeps pace with your programme rather than arriving all at once.
Yes — a two-way load takes arisings off site and returns with aggregate. It halves the movements through Stoke-on-Trent and is normally the cheapest way to run the job.
Tell us the material, volume and access — we come back within one working day.